The C&I Energy Problem

Your Electricity Bill Is Growing Faster Than Your Business

Peak Tariffs Hit When Production Runs Hardest

Factories pay the highest price per kWh exactly when demand peaks. Every kWh you shift from peak to off-peak hours goes straight back to your margin.

One Outage Can Cost a Whole Production Batch

Grid failures stop lines, spoil inventory and stress equipment. Diesel backup is slow to start, expensive to run and costly to maintain.

Rooftop Solar Goes to Waste Without Storage

Midday solar surplus is exported cheaply — then the same site buys evening power back at peak price. Storage keeps that energy value in-house.

How Storage Pays Back

Four Ways a C&I System Earns Its Keep

Peak-Valley Arbitrage

Charge at off-peak prices, discharge into peak windows — with two charge/discharge cycles per day where tariffs allow. For most factories this is the largest and most predictable revenue stream.

Demand Charge Management

Storage clips short demand spikes before they set your monthly demand charge. A few well-timed discharges can cut a major share of capacity-based fees.

Solar Self-Consumption

Pair storage with rooftop PV and raise on-site solar usage from roughly 30% to over 80% — you keep the full retail value of every kWh your roof produces.

Backup Power Without the Generator

Millisecond-level switchover keeps critical loads — production lines, cold storage, servers — running through outages, with no fuel, no noise and no exhaust.

20–256 kWhModular capacity range
6,000+LFP cycle life
10-YearDesign life
1,000 VHigh-voltage platform
System Selection

Which System Fits Your Site?

Your Situation Recommended System Capacity Range
Buildings, workshops, small C&I — loads below 100 kW Stack Type HV 20–81kWh 20.48 – 81.92 kWh (2+1 to 8+1 modules) View Details →
Factories and industrial parks — loads of 100–500 kW Stack Type HV 100–261kWh 100.48 – 261.25 kWh (5+1 to 13+1 modules) View Details →
Outdoor, unattended or harsh-environment sites Cabinet Type 96–256kWh 96 – 256 kWh, five all-in-one models View Details →
Above 500 kW or multi-MWh C&I projects 20FT Container BESS 3.44 / 5.015 MWh per unit, parallel expansion See Container ESS →
Global Projects

Proven in the Field

marwell solar stack lithium battery project in Ho Chi Minh City Vietnam

Ho Chi Minh City Factory Peak-Shaving Project

Time: 2026Location: Ho Chi Minh City, VietnamCapacity: 261 kWh (13+1)

A full-height 13+1 tower cuts peak demand and supports the factory during Vietnam’s evening tariff window.

marwell solar cabinet bess rooftop project video in Malaysia

Malaysia Rooftop Solar + Cabinet Project ▶ VIDEO

Time: 2025Location: MalaysiaCapacity: 96 kWh (MW-96KWH)

A rooftop PV array paired with an outdoor battery cabinet — commissioned and running stably as the building’s emergency power supply. Watch the project video.

marwell solar stack lithium battery project in Johannesburg South Africa

Johannesburg Industrial Park Backup Project

Time: 2025Location: Johannesburg, South AfricaCapacity: 480 kWh (3 towers)

Three stack towers inside a secure equipment room carry critical loads through load-shedding windows.

marwell solar cabinet bess project video in Vientiane Laos

Vientiane Hybrid Solar Storage Project ▶ VIDEO

Time: 2024Location: Vientiane, LaosCapacity: 209 kWh (MW-209KWH)

A 209kWh cabinet with wall-mounted hybrid inverters in a dedicated plant room — watch the on-site commissioning video.

marwell solar cabinet bess project in Chonburi Thailand

Chonburi EV-Charging Hub Project

Time: 2025Location: Chonburi, ThailandCapacity: 256 kWh (MW-256KWH)

A 256kWh cabinet under a solar carport buffers DC fast chargers, avoiding a costly grid-connection upgrade.

marwell solar cabinet bess project in Kuala Lumpur Malaysia

Kuala Lumpur Plant Peak-Shaving Project

Time: 2025Location: Kuala Lumpur, MalaysiaCapacity: 450 kWh (2 × MW-225KWH)

Two 225kWh cabinets on a raised platform shave evening peaks for a manufacturing plant near Kuala Lumpur.

From Factory to Site

Delivered as a Project, Not Just a Product

1 · System Design

Send us your load profile and tariff sheet — our engineers size the system, model the savings and return a concrete proposal with payback estimate.

2 · Factory Acceptance Test

Every system is fully assembled and tested before shipment — battery, PCS, BMS and communications verified as one unit, not on your site.

3 · Delivered & Commissioned

Pre-integrated systems arrive ready to connect: stack modules bolt together, cabinets set on a pad. Typical sites are commissioned in days, not weeks.

4 · Monitoring & Support

WiFi real-time monitoring and EMS-ready communication come standard, with remote diagnostics and engineering support for the life of the system.

IEC 62619Battery Safety
UN 38.3Transport
MSDSBattery Pack
IEC/EN 62109PCS Safety
EN 50549-1Grid Connection

Send Us Your Load Profile — Get a Sized Proposal

Download the Marwell Solar C&I BESS Catalog 2026 for full specifications, or share your electricity bill and site details — our engineers will reply within 24 hours.

Download Catalog ↓   Contact Us →

Contact Director Whatsapp